Almost four years after beginning our kitchen remodeling project, we have finally ordered our wall cabinets!!

Our last update was December 2008, two months before Isaac was born! At that point our plan was to save enough money to use cash to buy the cabinets. We actually had the money saved by that spring, but Isaac had to spend a week in the hospital with RSV, and our cabinet money went toward our medical insurance deductible.

We started saving again, and by the time we saved up enough, Isaac was needing tests for some minor developmental delays, including a very expensive MRI. There went our cabinet money toward another deductible. Soon after that, we needed to buy a car, so there wasn't much hope of saving up very quickly.

This week, however, we finally received the balance of our federal adoption tax credit. Yay! After several months of letters from the IRS asking for more paperwork proving the adoption, and proving the expenses toward the adoption, they decided we qualified for the credit. The day after the money was deposited in our checking account, we headed to Home Depot to order the cabinets.

I'm not sure how long it will be till they come in, but we will certainly post some pictures of the process, and the completed kitchen.

Monday, December 15, 2008

nearly finished

Since we last posted, I've built the small white cabinet in front of the chimney and added the chopping block top, and put up four window moldings and sills, and other miscellaneous moldings. I'm now working on door moldings. We've also bought three bar stools, and installed the range.

Saturday, June 14, 2008

Sink!

Mark worked all day, and finally got the sink installed...almost.


The sink is in, the faucet is hooked up, the garbage disposal is installed, but the drainpipe isn't connected to the sink drains. So, we have running water in the kitchen, but we have no easy way of disposing of it yet. For now we have a tub under the sink to catch the water. Hey, it's still a huge improvement over having no water at all.


Some good friends of ours were so kind as to offer to buy us a faucet for our new kitchen. How thoughtful! We picked this one out because one of the friends has it and their kitchen, and we really like it.
He looks very tired, doesn't he? He's been working so hard all day. But everything works, and there are no leaks! Yay!
Still a little more work to be done. It would have been done tonight, except the guy at the plumbing store sold Mark the wrong kind of trap for our plumbing. But a bucket will work for now.

We Have Counters!

The countertops came in last Monday, and Mark and I installed them (well, mostly Mark, but I helped). It makes a huge difference in how things look--it looks close to being finished! As I write Mark is downstairs installing the sink and garbage disposal--hopefully that will be done tonight. Having running water in our kitchen is going to be amazing!


Here's an idea of what they look like up close--they're black with whitish streaks that look like slate.











Wednesday, May 28, 2008

base cabinets

Here's where things stand now. We're waiting on the countertops to come in. We're also still waiting to see if the discount cabinet place can get any wall cabinets for us, otherwise we'll have to buy them from Home Depot which will be more expensive. I haven't gotten much done on the moldings. I'm out of the habit of working on the kitchen now, so it's hard to get started on anything. Plus I've been spending more time doing gardening.

Sunday, May 18, 2008

New flooring

I've gotten alot done since my last post, but I don't have pictures of everything yet. We finally took our old 1960's oven out to the curb a few weeks ago so I could put down the underlayment. It was in this state for a couple weeks while I filled the cracks and nail heads with wood filler and sanded.

We moved all our living room furniture into the dining room so we could unroll the new sheet vinyl to let it flatten out and then transfer the design and cut it out.
It is now firmly affixed to the kitchen flooor, which was quite a difficult job which Mindy helped me with. It's not perfect, but I just have to remind myself of the old faded, ripped, rumpled, grease stained carpet and be grateful for the vast improvement.
Thursday night (during Lost) I finished tuck pointing the chimney. Today I finished installing the base cabinets, which required much shimming and adjusting to get them level and parallel to the pattern on the floor. Tomorrow someone is coming from Home Depot to measure for the countertops and place the order. In the two weeks or so that it takes to get the counters delivered I will work on window and door moldings, kick plates and quarter rounds. And if I have time, I need to build a broom closet to go next to the new range.
I'll post more pictures when Mindy takes them.

Monday, April 14, 2008

Top coat done

I know it doesn't look done, but we just didn't paint behind where the cabinets are going to go to save paint. I only bought one gallon so we had to strech it a little. After finishing the blue, I realized I still hadn't done any mudding behind the oven, which we left sitting there so we can continue to use it. I finished the mudding the last couple days and tonight primed it. We have a little bit of blue left so I will paint that tomorrow.


We finalized our choice of flooring and I ordered it tonight. It's a sandstone colored sheet vinyl with a 9 inch square pattern. As soon as that comes in we'll take the old oven out to the curb so I can nail down the 1/4" underlayment, which Mindy and I bought and strapped to the roof of my car last weekend.